We recommend that you speak with your builder or Kindira Sales Team representative who will be able to guide you through the Approved Plan of Development – Envelope Plan and the Approved Plan of Development – Design Criteria (PoD documents) and how these relate to your specific lot. Where compliance with any particular design standard in Part 2 results in non-compliance with Part 1, then the design standard for Part 1 takes precedence. In all other instances, the design standards in Part 2 take precedence.
The Design and Siting Standards (Part 1) which includes the approved PoD documents should also be read with the Architectural and Landscape Design Standards (Part 2).
Hot Tip Site Coverage. When talking to your builder, make sure they design your home according to the relevant design controls. The maximum site cover must not exceed the limit indicated in the PoD Design Criteria.
The Approved PoD documents are available in:
Review the Approved PoD — Envelope Plan (Annexure A) and locate your lot.
Go to the Approved PoD — Design Criteria Document (Annexure B) and review Design Standards for your allotment type.
Work with your builder to design and site your house in accordance with the relevant Design Standard.